63RD Street Water Main Replacement Project
YEAR: 2015
SCOPE OF WORK
This project consists of a Water Main Replacement along 63rd Street between La Gorce Dr. and Indian Creek Dr. The installation of approximately 1,100 LF of 20-inch water main pipe of horizontal directional drilling, 210 LF of 12 inch, 280 LF of 8-inch, 200 LF of 6-inch of ductile iron pipe and fittings, relocation and replacement of one fire hydrant, traffic control and all ancillary and miscellaneous work as per plan and specifications.
CLIENT
City of Miami Beach
1700 Convention Center Dr, Miami Beach, FL 33139