City of Miami Beach Pump stations 10th and 14th Streets
YEAR: 2014
SCOPE OF WORK
The project consists of underground utility construction, consisted of protecting a primary FPL duct banks feeding the entire City of Miami Beach. In order for David Mancini & Sons, Inc. to design the deep shaft construction, the existing FPL was exposed allowing us to assess the ultimate location of the 35 feet deep shaft placement, we then installed (2) new storm water pump stations for the City of Miami Beach. Each pump station consisted of a diversion box, dissipater box, wet well, grate box, (3) junction boxes, a drainage defender box, 72-inch of reinforced concrete pipe and [4) Flygt CP 350l pumps. This project also contained storm water collection, disposal, tide flex valves, mechanical piping, control pane! and site concrete work consisting of pouring major slobs for electrical, thrust block and minor appurtenances.
CLIENT
City of Miami Beach; Bergeron (Prime Contractor)