Indian Creek Drive from 25th Street to 32nd Street
YEAR: 2017
SCOPE OF WORK
Installation of 2,400 linear feet of 72″ drainage pipe from 25th street to 32nd street. Install four eco vaults, junction box, grate box, wet well and outfall structures for a storm water pump station. DMSI raised the existing grades of Indian Creek from 26th to 28th street and had to harmonize to existing properties. Multiple side drainage was installed ranging from l 5″-36″ HDPE to accommodate side street connections. This Project was a DFA [Designated Funded Agreement) between FDOT and the City of Miami Beach. This work was performed utilizing the NJPA contract in order to expedite the work.
CLIENT
City of Miami Beach
1700 Convention Center Dr, Miami Beach, FL 33139